- Home
- Advice & Inspiration
- Fitting
What we do to your subfloor before LVT goes down

Luxury vinyl tile is thin and it is glued flat to whatever is underneath. A ridge, a hollow or a board edge in the subfloor will show through the finished floor within months. Most of what makes an LVT floor last is done before the first plank is laid.
Why we can’t quote properly from a photo
We can give a rough figure from your measurements. The exact price depends on the subfloor, and that can only be judged in person: how level it is, what it is made of, whether it is dry, and what has to come up first.
Concrete and screed
A solid floor is checked for moisture before anything else. New screeds in extensions and new builds can take a long time to dry, and LVT laid over a damp one will fail. Once the floor is dry, a smoothing compound is poured and trowelled over it to give a flat, even surface for the adhesive.
Floorboards
Boards move, and the gaps between them would show through. Loose boards are fixed, then the floor is overlaid with flooring-grade plywood, screwed down at close centres. The joints and screw heads are smoothed over before the LVT is laid.
Old tiles and old vinyl
Sometimes ceramic tiles can stay, if they are sound and the grout lines are filled and smoothed. Sometimes they have to come up. Old vinyl and its adhesive usually need removing. We’ll tell you which applies when we see the floor.
Floor heights and doors
Plywood and smoothing compound raise the floor by a few millimetres. That can mean trimming doors and choosing the right threshold where the new floor meets another room. We look at this at the survey so it is in the quote.
The standard we work to
The British Standard for fitting resilient floors such as LVT is BS 8203. It sets out how flat and how dry a subfloor needs to be. The whole team is trained in subfloor preparation as well as fitting, because we have seen what happens when it is skipped.
Questions people ask
Do I always need screed or plywood?
Nearly always one or the other. Very few existing floors are flat and smooth enough to glue LVT straight onto.
How long does preparation add?
It depends on the floor. Smoothing compound needs time to dry before fitting, so preparation and fitting are often on separate days.
Is preparation included in the quote?
Yes. Once Mark has seen the floor, the written quote lists the preparation needed.
Question not answered? Message Mark on WhatsApp, call 07837 081960 or send an enquiry and we’ll get back to you.
Advice is general. Every floor is different, which is why a quote always follows a visit.
